Construction of Storm Water / Retention Ponds

GGLP Industrial Division has diligently executed the construction of Storm Water and Retention ‘Ponds’. By drawing on the in depth knowledge and experience available in house, we are able to create Retention ‘Ponds’ of virtually any size to suit our clients requirements.



Services:

  • Bulk Excavation of Area
  • Bulk Hauling of Excavated Materials
  • Surface Preparation of Area
  • Liner Deployment
  • Leak Detection Installation
  • Collector Pipe Installation
  • Liner Protection
  • Backfilling
  • Final Grading of Area
  • Construction of associated Sumps and / or Pump Houses

Designed by Gratisites Inc.: Calgary web design